8 wastes in Management that all leader should know explained with Case Study : TimeManagement


This is great material. I’m a lab technician and one of our lead engineers has just come back from quarantine leave. We are suffering from low volume currently and he decided to point fingers at the technician team, claiming that we’re over processing our goods. We test and repair units prior to sending them to shipping. Our team detects product defects in test and corrects them because the engineering team has poor defect prevention. The engineering lead who just came back to work after two months of leave has decided that for some reason, the fault of the engineering team’s poor defect prevention lands upon the team of end item technicians.



Source link

Trupen Patel

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top